The East Anglia One offshore wind farm, UK an average nominal return on equity of about 9.5 % in new projects. The renewables portfolio receives US $ 23bn, with 38 % dedicated to offshore wind. Projects under construction include East Anglia TWO and East Anglia THREE in the UK, alongside Windanker in Germany.
By 2028, Iberdrola expects to exceed 60GW of installed renewable capacity, with 75 % already under construction or ready to build. Approximately 85 % of production will be secured through long-term contracts and power purchase agreements.
“ Electrification is unstoppable, and electrification means security”
José Ignacio Sánchez Galán Executive Chairmanr
Iberdrola
energydigital. com 81